TI delivered a turnkey high-temperature heat pump solution to replace legacy gas systems
Project Snapshot
Location:
51 Clarendon Rd, Watford
Asset:
41,000 sq ft office building
System Capacity:
300kW HT heat pumps (80°C flow)
Duration:
6-week installation
Challenge & Objectives
TI was appointed to deliver a rapid and future-proof gas boiler replacement. The challenge was to retrofit a high-capacity, low-carbon system without costly grid upgrades or disruption to existing tenants.
Our Solution
Key Outcomes
Installation completed in just 6 weeks
Improved EPC rating and lower operating costs for tenants
Decarbonised heating without major infrastructure upgrades
Long-term resilience and compliance with tightening regulations