Electrical Lifecycle Testing

Stop replacing electrical infrastructure on a guess

Most switchgear is condemned on its age, by surveys that never open the panel. We test what’s actually inside, so you only replace what needs replacing.

Intrusive condition testing on commercial electrical switchgear
The problem

Age is a poor guide to condition

Standard surveys look at the outside of a panel, check its age against a table and give it a replacement year. That is how a sound electrical system ends up with a seven-figure replacement programme.

60+ yrs
 
Transformer lifespans on record, well beyond the guide tables (BEAMA)

7 figures
 
Replacement spend that a single intrusive survey can defer

4 bodies
 
Ofgem, CIBSE, BEAMA and the HSE all say age alone is not a reason to replace
When you need this

Three common starting points

A survey recommended a big replacement
You have a report that dates your switchgear for replacement, and a large bill attached to it.
You’re about to electrify
Heat pumps and EV chargers depend on the electrical kit you already have. You need to know it can take the load.
You’re buying a building
Due diligence needs the true condition of the HV and LV equipment, not an age-based guess.

The difference

We open the panel. Standard surveys don't

Standard non-intrusive survey
✕A visual check from outside, with the enclosures closed
✕Graded on age and appearance
✕Life-expectancy tables used as fixed limits, against their publishers’ own advice
✕Result: a replacement year, often with a seven-figure programme

TI intrusive lifecycle testing
✓Safe isolation, with panels opened and dismantled
✓Measured: insulation, contact resistance, partial discharge, protection and oil (DGA)
✓Graded on actual condition and duty
✓Result: evidence, clear priorities, and remedial works by the same team

The principle: replace on condition, not age. CIBSE Guide M’s life tables are indicative, and Ofgem, CIBSE, BEAMA and the HSE all say age alone is not a basis for replacement.

Our Process

Four steps from records to remedials

1
Asset data review
We find out what records exist and what they tell us.

2
On-site intrusive testing
Our electrical engineers open, measure and record LV and HV equipment on site.
Planned outages, scheduled out of hours and agreed with your tenants.

3
Condition report
Every intervention is given a priority:
Critical
High
Medium
Low

4
Remedial works
Delivered against the agreed priorities, by the same team that did the testing.
Replace on evidence

The gap between the guide table and reality is where the money is

Guide tables give an indicative economic life. Real equipment, tested and maintained, often lasts far longer.

Indicative life (guide tables)
Service life on record

Transformers
25–30 yrs
60+ yrs

Switchgear
25–30 yrs
40+ yrs

LV panels
20–25 yrs
35+ yrs

 
0
20
40
60 yrs

Indicative figures: CIBSE Guide M, indicative economic life expectancy. Transformer service life on record: BEAMA.
One survey, two returns

Save on replacement now, and know your capacity for later

Today
Avoided replacement CapEx
Every decade of extra life defers a seven-figure replacement.
Tomorrow
Verified headroom for electrification
Know exactly what your kit can carry before adding heat pumps or EV chargers.
See Power Strategy

One turnkey partner

From strategy to maintenance, one team

Strategy The costed power plan and business case
Survey Capacity measured on site
Design Grid, solar, battery and EMS engineered together
Install Delivered around the building’s occupants
Maintain Operated and optimised over the long term

Find out what your electrical kit is really worth

Send us your asset register and maintenance records. We'll tell you what's worth testing first and where replacement spend could be deferred.