SFDR PAIs you can trace to the source
Every number, back to where it came from.
How TI built the 2025 SFDR Principal Adverse Impact (PAI) statements for NextEnergy Capital’s funds, with greenhouse gas emissions and PCAF attribution, and every figure traceable from the headline number to the raw data.
4
funds, each with its own PAI statement
21
PAI indicators calculated for each fund’s Annex I statement: 14 mandatory and 7 additional

The challenge
The data sits with our operators. How do we publish PAIs we can stand behind?
A PAI statement draws on data from multiple teams, each with its own format and level of detail.
Our approach is to bring it all together at the level where it can be checked, the asset, and build each fund’s figures up from there.
The result is a statement in which every figure traces back to the data as it was received.
How it works
From many different data sources to a figure you can trace
1
Collect
A data request built on a list agreed with NextEnergy Capital, naming the contact point for each data item. We follow up with every contact point and meet NextEnergy Capital weekly to review progress, updates and data queries.
2
Sense-check
Each dataset is checked for completeness and magnitude. Queries go back to providers for clarification.
3
Reconcile
Every dataset received is reconciled to the fund’s own asset list, so gaps are identified and queried.
4
Estimate
Where data is unavailable, gaps are closed using a defined, disclosed and documented methodology.
5
Trace
Every figure is calculated asset by asset and rolled up into each fund’s PAI statement, with the link to the source data kept at every step.
The calculation
From activity data to emissions
Emissions are calculated by applying an emission factor to activity data, and each result is classified by scope and category in line with the GHG Protocol.
Accuracy and reliability
Several approaches are taken to enhance the accuracy and reliability of the calculations.
Raw data mapping
Every dataset is mapped to the fund’s asset list before any calculation. This matches each figure to the right asset and serves as a check that the data is complete.
Construction emission factor
Developed by TI from supplier life-cycle data provided by NextEnergy Capital, so construction emissions rest on evidence specific to NextEnergy Capital’s portfolio. It covers production, transport and installation, per MW.
First generation dates
No asset is reported until it reaches its first generation date. We request this date for every asset, so that construction emissions, which are recognised at a single point in time, are accounted for in the correct period.
Three streams make up NextEnergy Capital’s reported footprint.
Scope 2: imported electricity
Where sites import electricity, we report Scope 2 on both bases the GHG Protocol asks for. The location-based figure applies the grid emission factor for the country. The market-based figure applies the supplier-specific factor, so contracted renewable supply is reported at zero.
Scope 3: operational activity
Operational data is collected through a survey co-developed by TI and distributed by NextEnergy Capital to its O&M contractors. It covers fuel used by site vehicles, waste, water and freight. Each activity is converted using DEFRA emission factors. Because a single response often covers several sites, results are allocated to individual assets in proportion to installed capacity.
Scope 3: construction
The embedded emissions of building a solar site are calculated by applying the construction emission factor to the asset’s installed capacity (MWp), and recognised once, in the period the asset reaches its first generation date.
Reading the trend: because construction emissions are recognised at a single point in time, Scope 3 rises in a year with new sites and falls in a year without them. We state the method alongside the figure, so a movement is read for what it is, not as a change in performance.
PCAF
Emissions allocated between equity and debt
The emissions of assets within NextEnergy Capital’s funds are allocated between equity and debt, following the Partnership for Carbon Accounting Financials (PCAF). The allocation reflects each asset’s own financial structure, including the fund’s share of equity ownership and the debt financing. This helps to avoid overstating emissions, and supports transparent, reliable disclosure.
What good looks like
Cost, continuity and defensibility
What a fund manager should ask of any PAI process before relying on its numbers
What does it cost your team?
We chase the requested data, query the odd values and reconcile the sources, so your team reviews results instead of building them.
Will it work again next year?
The next cycle starts from a process that already runs: the contacts, the asset list and the method are in place.
Can you defend every number?
Estimates are flagged as estimates, never blended in with measured data. Where a provider cannot supply a value, we estimate it with a stated method: a capacity-based intensity taken from the assets that did report, applied to the asset with the gap. The estimate is then flagged, adjusted to the fund’s share, and documented, so a reader can see exactly what is measured and what is not.
What NextEnergy Capital gets
Statements that stand up to questions
This year
Comparable across funds
Every fund’s figures are built the same way, so statements can be read side by side.
Next year
Changes you can explain
With the method fixed, a movement in a number points to something real, and the audit trail shows where.
Throughout
Traceable to the raw data
Any figure in a statement can be followed, asset by asset, through the master emissions inventory to the raw data it came from.
Start with your data
Can you trace every PAI figure to its source?
Tell us what you report today and where the data comes from. We’ll show you where the gaps are and what a traceable version looks like.